1986 September, HEMS system extended to Ironton, Carmel Church, Ironton ridge tower
1986 December, TV studio production moves to Studio A
1987 May, WOUC-FM began operation on 89.1 MHz with 5 Kw of power
1987 Summer, Simulsat receiving antenna installed on the roof of RTVC
1987 September, HEMS system operations extended to Belmont
1987 Fall, ACTV-7 News began origination from new Scripps studio
1987 October, WOUL-FM began operation on 89.1 MHz with 50 Kw of power
1988 January, New Campus Communication Network; coaxial cable to 100 buildings
1988 January, "Ohio University of the Air" FM SCA technical experiments
1988 April, 24 hour weather channel service on CCTV supported by Avionics Department
1988 June, New color cameras installed in TV Studio A
1988 September, New microwave system to Lancaster completed
1988 November, Microwave system to Zanesville completed
1989 April, McCracken MW site became operational
1989 August, Chillicothe HEMS site began